Latest News

Day: April 7, 2024

PH needs 53GW by 2040 under higher RE portfolio standard

ILOILO CITY: The country would need 52.83 gigawatts of renewable energy (RE) capacity by 2040 after the Department of Energy (DOE) hiked the renewable portfolio standard (RPS) to 2.52 percent, an energy official said.

During the Philippine Electric P…

SMOOTH TRAFFIC FLOW ON SEVERAL HIGHWAYS TONIGHT

KUALA LUMPUR, Traffic flow on several major highways was reported to be smooth as of 10 pm today.

However, a Malaysian Highway Authority (LLM) spokesman said vehicles are reported to be moving slowly from Rawang to Sungai Buaya due to an accident in…

Recent Posts