NGCP Completes Amlan 69kV Line Reconductoring in Negros Oriental
Amlan: The National Grid Corporation of the Philippines (NGCP) announced the completion of the reconductoring of the 69kV line at its substation in Amlan, Negros Oriental. This development is expected to ensure the delivery of stable power to the areas served by the substation. According to Philippines News Agency, Michelle Visera of NGCP-Visayas shared that the replacement of bigger transmission lines will prevent manual load dropping (MLD) during peak load times, particularly in Dumaguete City, which experiences the highest demand for power. Visera emphasized that, barring emergencies, MLD will no longer pose a problem for the Amlan 69kV line as