Luzon grid back to normal

The Department of Energy (DOE) announced Friday that power situation in Luzon is back to normal after placing the Luzon grid under “yellow alert” as two power plants shut down on Thursday.

 

“With both the 344-megawatt (MW) Masinloc Coal-Fired Power Plant Unit 2 and …

Read More